This page displays some of our most interesting pieces of work.

The upper chamber ¹13 Southern channels in Saburovo:

On this site the following works were conducted:

  • The system of a monolithic reinforced concrete chamber on an existing duker (5 pipes by a diameter of 2000 mm.)
  • Installation of five gate valves by a diameter of 2 m. on the existing working pipelines.
  • Dismantling (in the existing upper chamber) of the duker of five shield shutters (d = 2000mm) amounting to five shandor locks.

Town Severnyi (treatment structures for the shower drain sewerage system for Severnyi's water stapipe line system):

On this site the following operations were conducted:

  • The construction of a drain water purification system
  • The construction of an overground brick building.
  • Finishing operations, (plastering, painting etc).
  • Equipment installation

Spartakovskaya Square 16, Business centre, Moscow

On this site the following operations were conducted:

  • Various work on the construction of the external and internal systems (heating, hot- and cold-water, sewerage, etc).
  • Decorative fountain built for the business center.

Town Rozdestveno (purification and water intake structures):

On this site the following operations were conducted:

  • The construction of 2 monolithic reinforced-concrete reservoirs.
  • The building of the underground and overground parts of a spring water purification system from brick.
  • TThe construction of the underground and overground parts of a treatment system (from brick) for fecal sewerage.
  • Binding of the structures (mentioned above) by pipe lines.
  • Finishing operations (plastering, painting etc).

Korolev (urban refining structures of shower drain sewerage system)

On this object the following operations were conducted:

  • The building of the modular-monolithic underground part of the shower drainage system.
  • The building of the overground part of the system and installation of treatment equipment.
  • Finishing operations (plastering, painting etc).


The steel pipe is placed underneath the obstacle (roads, buildings etc).


 